Meanwell Driver and CREE Chip 350W COB LED Floodlight
US$420.00 | 10 Pieces (MOQ) |
Production Capacity:
10000/Month
Transport Package:
1PCS/Carton
Payment Terms:
T/T, Paypal, Money Gram, Western Union
Guangdong, China
Last Login Date:
May 01, 2017
Business Type:
Manufacturer/Factory, Trading Company
Main Products:
LED Tube, LED Panel Light, LED Bulb, LED Spotlight, LED High Bay Light, LED Tunne Light, LED Flood Light, LED Canopy Light, LED Street Light, LED Grow Light
Find Similar Products
Product Description
Company Info
Basic Info.
Model NO.
TG350
Color Temperature
Lamp Body Material
Power
Projection Distance
>35m
Application
Park, Square, Factory, Garden
IP Rating
Certification
CE, EMC, FCC, PSE, RoHS
Operating Voltage
Input Voltage
LED Chips Brand
CREE
Lumen
33000lm
Cct
2700-7000k
CRI
>75
Working Temperature
-40-50
Warranty
3 Years
Trademark
Deli
Specification
CE, ROHS
Origin
China
HS Code
940540900
Product Description
Specification:
Power: 350W
Input Voltage: AC85-265V
LED Chip: CREE
Lumen:33000lm
CCT: 2700-7000k
CRI: >75
IP Rate: 65
Beam Angle: 60/90/120
Lifespan: 50000hours
Warranty: 3 Years Warranty
Mean Well Driver
Bridgelux and Epistar are available.
Customized service is welcome.
For more information please do not hesitate to contact us. Thanks!
Features and advantages
CE, RoHS approved,
High efficency and high lumens.
IP65 waterproof.
Maintenance free
Die -casting aluminum casing and high intensity toughened glass cover.
Bridgelux and Epistar chip for your choosing.
2 years warranty and 50000 hours lifespan.
Wide radiation angle, huge lighting area.
Low heat emission, Good heat dissipation
No flickering, No RF interference, No UV radiation
Application
1. Tunnel
2. Gas Station
3. Factory
4. Warehouse
5. Hall
6. Square
7. Parking Lot
8. Supermarket
9. Stadium
10. Football Field, etc.
Quality Control:
Every order is checked throughout the production process by our QC department. 100% of the led tube light will be tested and keep lighting for 24 hours to test its quality reliability, and we will also test its temperature after 24 hours' lighting. Then after it is cool we again test 100% of the lamps to see if it still works well. Each lamp should pass all these QC procedures before shipping to customer
DELIVERY TIME
- 1-3 working days for sample order, 10-12 workings for bulk order, depend on Q'ty.
- Can send order via DHL, UPS, Fedex, and TNT.
DHL: 3-4 working days.
UPS: 4-5 working days.
Fedex: 5-6 working days.
PAYMENT TERM
- Payment: T/T in advanced, 50% deposit, 50% balance paid before shipping.
- Production lead time: 10 working days for 4000-5000 pcs.
- Discounts are offered based on order quantities.
- Western Union and Papal are available for sample order.
OUR SERVICES
- Any of your questions can be replied in 24 hours by well-trained.
- OEM available, it's our pleasure to help the customer design and manufacture new products.
- Warranty: 2 year, we can repair or replace a new one during this period.
Power: 350W
Input Voltage: AC85-265V
LED Chip: CREE
Lumen:33000lm
CCT: 2700-7000k
CRI: >75
IP Rate: 65
Beam Angle: 60/90/120
Lifespan: 50000hours
Warranty: 3 Years Warranty
Mean Well Driver
Bridgelux and Epistar are available.
Customized service is welcome.
For more information please do not hesitate to contact us. Thanks!
Features and advantages
CE, RoHS approved,
High efficency and high lumens.
IP65 waterproof.
Maintenance free
Die -casting aluminum casing and high intensity toughened glass cover.
Bridgelux and Epistar chip for your choosing.
2 years warranty and 50000 hours lifespan.
Wide radiation angle, huge lighting area.
Low heat emission, Good heat dissipation
No flickering, No RF interference, No UV radiation
Application
1. Tunnel
2. Gas Station
3. Factory
4. Warehouse
5. Hall
6. Square
7. Parking Lot
8. Supermarket
9. Stadium
10. Football Field, etc.
Quality Control:
Every order is checked throughout the production process by our QC department. 100% of the led tube light will be tested and keep lighting for 24 hours to test its quality reliability, and we will also test its temperature after 24 hours' lighting. Then after it is cool we again test 100% of the lamps to see if it still works well. Each lamp should pass all these QC procedures before shipping to customer
DELIVERY TIME
- 1-3 working days for sample order, 10-12 workings for bulk order, depend on Q'ty.
- Can send order via DHL, UPS, Fedex, and TNT.
DHL: 3-4 working days.
UPS: 4-5 working days.
Fedex: 5-6 working days.
PAYMENT TERM
- Payment: T/T in advanced, 50% deposit, 50% balance paid before shipping.
- Production lead time: 10 working days for 4000-5000 pcs.
- Discounts are offered based on order quantities.
- Western Union and Papal are available for sample order.
OUR SERVICES
- Any of your questions can be replied in 24 hours by well-trained.
- OEM available, it's our pleasure to help the customer design and manufacture new products.
- Warranty: 2 year, we can repair or replace a new one during this period.
Parameter | Value |
Power Consumption | 350W |
Input Voltage | AC85-265V,12-24VDC |
Power Factor | 50/60Hz |
Lamp Efficiency(%) | >0.95 |
Color Temperature(K) | 2700K~6500K |
Junction Temperature(TJ)) | <70°C |
Color Rendering Index(CRI) | Ra>75 |
Light Efficiency | 70-80 Lumen per watt |
IP Grade | IP65 |
Beam Angle | 120 degree |
Storage Temperature | -40°C-55°C |
Lifespan | >50000H |
Material | Aluminium Alloy+lens |
Send your message to this supplier
People who liked this also liked